Tuesday, May 24, 2011

Finish work...

The Living room is taking form.

Living room

Living room looking towards the dining room.

The kitchen

The stairs will go here.

From the kitchen looking towards the dining room and living room.


The kitchen from the bottom of the staircase.

Looking into the front bedroom. In-floor heating is in place.

This will be the stairs to the top floor.

Front bedroom

Front bedroom

Front bedroom

Guest bathroom


Master bedroom

Master bedroom


Master bathroom

Master bedroom

Tuesday, May 10, 2011

Insulation, dry wall and electrical

All the exterior walls get two layers of 8 cm insulation.
This wall still has one layer to go.


This is a new kitchen window.

This is where the kitchen sink will go.

Lots of insulation on this project.

Two new doors. The one on the right will be a glass door going
to the kitchen and the one on the left will  go to the utility room.

Tearing out the ceiling to the attic.

Plumbing for the guest bath toilet.




Framing in a window.



Almost ready for the wall-board.