Sunday, September 25, 2011

The After Pictures

OK finally some pictures of the finished product. Paintings are not up yet but you will get the idea...
We are still working on the rest of the house but more "after pictures will be posted soon.

The Master bedroom:




The Master Bath:
The  Guest bathroom:




Tuesday, May 24, 2011

Finish work...

The Living room is taking form.

Living room

Living room looking towards the dining room.

The kitchen

The stairs will go here.

From the kitchen looking towards the dining room and living room.


The kitchen from the bottom of the staircase.

Looking into the front bedroom. In-floor heating is in place.

This will be the stairs to the top floor.

Front bedroom

Front bedroom

Front bedroom

Guest bathroom


Master bedroom

Master bedroom


Master bathroom

Master bedroom

Tuesday, May 10, 2011

Insulation, dry wall and electrical

All the exterior walls get two layers of 8 cm insulation.
This wall still has one layer to go.


This is a new kitchen window.

This is where the kitchen sink will go.

Lots of insulation on this project.

Two new doors. The one on the right will be a glass door going
to the kitchen and the one on the left will  go to the utility room.

Tearing out the ceiling to the attic.

Plumbing for the guest bath toilet.




Framing in a window.



Almost ready for the wall-board.


Thursday, March 24, 2011

The Rebuilding Begins...

These are the integrated floor/ceiling joists.

The first wall goes up...

Digging out the kitchen floor.

Floors are in..

Framing the walls in the front bedroom...

Looking into the front bedroom from the study...

New walls.

Wiring on the kitchen floor.

More wiring and water supplies.

This is where the kitchen sink will be.

Pumping the concrete for the kitchen floor. 

Pouring the new kitchen floor.

Saturday, January 15, 2011

The Professionals Take Over...

When we arrived, we had an idea there had been some activity due to the size of the skiffs...





...and they were full too!
The inside was shocking!