OK finally some pictures of the finished product. Paintings are not up yet but you will get the idea...
We are still working on the rest of the house but more "after pictures will be posted soon.
The Master bedroom:
Sunday, September 25, 2011
Tuesday, May 24, 2011
Finish work...
The Living room is taking form. |
Living room |
Living room looking towards the dining room. |
The kitchen |
The stairs will go here. |
From the kitchen looking towards the dining room and living room. |
The kitchen from the bottom of the staircase. |
Looking into the front bedroom. In-floor heating is in place. |
This will be the stairs to the top floor. |
Front bedroom |
Front bedroom |
Front bedroom |
Guest bathroom |
Master bedroom |
Master bedroom |
Master bathroom |
Master bedroom |
Tuesday, May 10, 2011
Insulation, dry wall and electrical
All the exterior walls get two layers of 8 cm insulation. This wall still has one layer to go. |
This is a new kitchen window. |
This is where the kitchen sink will go. |
Lots of insulation on this project. |
Two new doors. The one on the right will be a glass door going to the kitchen and the one on the left will go to the utility room. |
Tearing out the ceiling to the attic. |
Plumbing for the guest bath toilet.
|
Almost ready for the wall-board. |
Thursday, March 24, 2011
The Rebuilding Begins...
These are the integrated floor/ceiling joists. |
The first wall goes up... |
Digging out the kitchen floor. |
Floors are in.. |
Framing the walls in the front bedroom... |
Looking into the front bedroom from the study... |
New walls. |
Wiring on the kitchen floor. |
More wiring and water supplies. |
This is where the kitchen sink will be. |
Pumping the concrete for the kitchen floor. |
Pouring the new kitchen floor. |
Saturday, January 15, 2011
The Professionals Take Over...
Subscribe to:
Posts (Atom)